SWMS template · General Construction

Line Marking — Safe Work Method Statement

Safe Work Method Statement for road, car park, warehouse and sports surface line marking, covering traffic and plant separation, surface preparation and old line removal, airless spray paint application, thermoplastic hot-applied materials, glass beads and solvent clean-up.

Category
General Construction
HRCW
2 categories
Job steps
7
Hazards rated
20
PPE items
8

Line marking on roads and in car parks open to vehicles is High Risk Construction Work because you are working on or next to a traffic corridor in use by traffic. Truck-mounted and ride-on line markers are also powered mobile plant. A SWMS is required. Line marking inside a closed warehouse or on a sports court with no traffic or plant may not be HRCW, but warehouses usually have forklifts operating, so check before you remove those types from the SWMS.

Traffic is the main hazard. Line markers spend long periods bent over or walking backwards, looking at the line, not the traffic. On public roads, work to a traffic management plan prepared by a suitably qualified person, and use traffic controllers with the accreditation your state or territory road authority requires. Traffic control rules differ between jurisdictions, so check with your road authority. In car parks, agree a staged closure with the centre or owner, close each section with barriers and cones, and do not rely on drivers seeing you. Plan reversing movements of the line marking truck and use a spotter.

The materials bring their own hazards. Solvent-borne road paints are flammable and give off vapour, so check the SDS and keep ignition sources away. Airless spray equipment runs at high pressure and can inject paint into skin. Thermoplastic is melted in a gas-fired kettle and applied hot, at temperatures that cause severe burns on contact, so it needs heat-resistant gloves, long sleeves and a face shield. Gas cylinders for kettles must be secured and checked for leaks. Glass beads are a slip hazard on hard surfaces and an eye irritant.

Removing old lines by grinding or water blasting generates silica dust and noise and needs wet methods or extraction, hearing protection and respiratory protection. Long days on bitumen also mean heat stress, so plan water, shade and rest breaks.

Customise this template with the location and surface type, the traffic management plan or car park closure arrangement, who provides traffic control, the line marking equipment and plant, the paint or thermoplastic products and SDS references, gas cylinder arrangements, the line removal method, and the clean-up and waste disposal process.

High Risk Construction Work Types

  • Work on, in or adjacent to a road, railway or other traffic corridor in use by traffic
  • Work in an area with movement of powered mobile plant

Personal Protective Equipment

  • High-visibility clothing (day and night rated as required)
  • Steel-capped safety boots
  • Safety glasses
  • Chemical-resistant gloves (paint and solvents)
  • Heat-resistant gloves, long sleeves and face shield (thermoplastic)
  • Organic vapour respirator (solvent-borne paints in poorly ventilated areas)
  • P2 respirator and hearing protection (line removal)
  • Long-sleeve shirt, hat and sunscreen

Risk Assessment

RatingsCatastrophicHighModerateLow

Step 1Planning, traffic control and area closure

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Struck by traffic on a public roadCatastrophicWork to an approved traffic management plan. Accredited traffic controllers set up and remove devices. Use a protection vehicle where the plan requires one. High-visibility clothing for everyone.ModerateSupervisor
Struck by vehicles in a car parkHighAgree a staged closure with the owner or centre manager. Close each section with barriers and cones before work. Do not mark in open aisles with vehicles moving.LowSupervisor
Forklifts operating in warehousesHighAgree exclusion zones with the warehouse manager. Isolate the work area with barriers. Forklifts kept out of marked zones until lines are dry.LowSupervisor

Step 2Surface preparation and removing old lines

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Silica dust from grinding old linesHighUse wet grinding or water blasting, or a grinder with on-tool extraction. P2 respirator. No dry sweeping of grinding dust.LowLine Marker
Noise from grinders, blowers and water blastingModerateHearing protection for operators and anyone nearby. Limit time on the tool.LowLine Marker
Water blasting injection injuryHighTrained operators only. Never point the lance at anyone. Keep others outside the barricaded zone.LowLine Marker

Step 3Set-out

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Working bent over and walking backwards near trafficHighA second person watches for traffic and plant while set-out is done. Stay inside the closed area. Face oncoming traffic where possible.ModerateLine Marker
Back strain from repeated bendingModerateUse long-handled chalk lines and wheel measurers. Rotate tasks.LowLine Marker

Step 4Applying paint with airless spray or walk-behind machine

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Fire from flammable paint and solvent vapourHighNo smoking or ignition sources near paint. Keep lids on drums. Store paint shaded and secured in the vehicle.LowLine Marker
Inhaling solvent vapourModerateRead the SDS. Use water-borne paint where the job allows. In enclosed car parks, ventilate and wear an organic vapour respirator.LowLine Marker
Paint injection from airless spray gunHighTrigger lock on when not spraying. Release pressure before cleaning tips or changing nozzles. Never wipe the tip with a finger.LowLine Marker
Run over by ride-on or truck-mounted markerHighTrained operators only. Workers on foot stay where the operator can see them. Spotter for reversing.LowPlant Operator

Step 5Thermoplastic application

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Severe burns from molten thermoplasticHighHeat-resistant gloves, long sleeves and face shield. Load kettles slowly to avoid splashing. Keep others away from the kettle and applicator.LowLine Marker
Gas cylinder leak or fire at the kettleHighCylinders secured upright. Leak test connections with leak detection solution at each set-up. Fire extinguisher on the vehicle. Shut off gas when not in use.LowLine Marker
Fumes from overheated materialModerateHeat to the manufacturer's temperature range only. Stand upwind of the kettle.LowLine Marker

Step 6Glass bead application and protecting wet lines

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Slips on glass beadsModerateApply beads only to wet lines. Sweep up spilt beads straight away. Boots with good tread.LowLine Marker
Eye irritation from bead dustModerateSafety glasses while loading and dispensing beads.LowLine Marker
Vehicles driving on wet lines and staff re-entering earlyModerateKeep closures in place until lines are dry to the paint manufacturer's time. Confirm with the supervisor before reopening.LowSupervisor

Step 7Equipment clean-up and removal of traffic control

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Skin contact and fire from cleaning solventsModerateClean equipment away from ignition sources. Chemical-resistant gloves. Collect waste solvent and paint for licensed disposal, not into drains.LowLine Marker
Struck by traffic while removing devicesHighRemove devices in the reverse order to the plan. Accredited traffic controllers only. Reopen lanes only when all workers and equipment are clear.ModerateTraffic Controller

Relevant Codes of Practice

Worker Acknowledgement

By signing below, I confirm that I have read, understood and agree to comply with this Safe Work Method Statement.

NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature
NameDateSignature