Checklist · Site Safety & Administration

Lift Plan Checklist

Checklist for planning a crane lift, from load details and crane selection through ground conditions, rigging, exclusion zones and communication. Used by the crane crew, dogger or rigger and supervisor before routine, critical or complex lifts.

39 checklist items

Checklist Items

ItemPass / YesFail / No
LIFT DETAILS
Date of Lift
Site / Project
Description of Load and Lift
Lift Category (routine / critical / complex / tandem)
Lift Planned By
Crane Operator Name and HRW Licence Number
Dogger / Rigger Name and HRW Licence Number
LOAD
Load Weight (kg), confirmed by drawing, weighing or supplier data
Rigging Weight (kg) including hook block, slings, shackles and spreader bar
Total Lifted Weight (kg)
Centre of gravity known and lifting points identifiedPassFail
Load is free (not bolted down, frozen, suctioned or snagged)PassFail
Loose items removed or secured on the loadPassFail
CRANE SELECTION & SET-UP
Crane Make, Model and Configuration
Maximum Working Radius (m)
Rated Capacity at Radius and Configuration (kg), from load chart
Total lifted weight within rated capacity with margin set by your procedurePassFail
Crane pre-start completed; LMI / RCI set to the actual configurationPassFail
Ground bearing capacity confirmed for outrigger loads; outrigger mats / pads sized correctlyPassFail
Set-up position clear of excavations, trenches, retaining walls and underground servicesPassFail
Crane level within manufacturer's tolerancePassFail
RIGGING
Rigging method selected and sling angles calculatedPassFail
Slings, shackles and lifting gear rated for the load, tagged and inspected before usePassFail
Edge protection / packers used on sharp edgesPassFail
Tag lines provided to control load rotationPassFail
HAZARDS & EXCLUSION ZONE
Overhead powerlines identified; approach distances and spotter arranged (contact network operator if needed)PassFail
Exclusion zone marked under the load path and slew area; no one under suspended loadsPassFail
Public, traffic and neighbouring property protected (permits obtained if required)PassFail
Wind speed within crane and load limits; wind-sensitive loads (panels, sheets) assessedPassFail
Landing area prepared, clear and able to take the load; dunnage in placePassFail
COMMUNICATION
Signalling method agreed (radio channel / hand or whistle signals)PassFail
Radio check completed; dogger visible to operator or radio used for blind liftsPassFail
Lift briefing held with all involved; roles confirmedPassFail
Stop-work authority understood by allPassFail
APPROVAL
Lift approved to proceedYesNo
Notes / Conditions
Lift Planner Signature
Crane Operator Signature
Dogger / Rigger Signature