Checklist · Site Safety & Administration
Lift Plan Checklist
Checklist for planning a crane lift, from load details and crane selection through ground conditions, rigging, exclusion zones and communication. Used by the crane crew, dogger or rigger and supervisor before routine, critical or complex lifts.
39 checklist items
Checklist Items
| Item | Pass / Yes | Fail / No |
|---|---|---|
| LIFT DETAILS | ||
| Date of Lift | ||
| Site / Project | ||
| Description of Load and Lift | ||
| Lift Category (routine / critical / complex / tandem) | ||
| Lift Planned By | ||
| Crane Operator Name and HRW Licence Number | ||
| Dogger / Rigger Name and HRW Licence Number | ||
| LOAD | ||
| Load Weight (kg), confirmed by drawing, weighing or supplier data | ||
| Rigging Weight (kg) including hook block, slings, shackles and spreader bar | ||
| Total Lifted Weight (kg) | ||
| Centre of gravity known and lifting points identified | Pass | Fail |
| Load is free (not bolted down, frozen, suctioned or snagged) | Pass | Fail |
| Loose items removed or secured on the load | Pass | Fail |
| CRANE SELECTION & SET-UP | ||
| Crane Make, Model and Configuration | ||
| Maximum Working Radius (m) | ||
| Rated Capacity at Radius and Configuration (kg), from load chart | ||
| Total lifted weight within rated capacity with margin set by your procedure | Pass | Fail |
| Crane pre-start completed; LMI / RCI set to the actual configuration | Pass | Fail |
| Ground bearing capacity confirmed for outrigger loads; outrigger mats / pads sized correctly | Pass | Fail |
| Set-up position clear of excavations, trenches, retaining walls and underground services | Pass | Fail |
| Crane level within manufacturer's tolerance | Pass | Fail |
| RIGGING | ||
| Rigging method selected and sling angles calculated | Pass | Fail |
| Slings, shackles and lifting gear rated for the load, tagged and inspected before use | Pass | Fail |
| Edge protection / packers used on sharp edges | Pass | Fail |
| Tag lines provided to control load rotation | Pass | Fail |
| HAZARDS & EXCLUSION ZONE | ||
| Overhead powerlines identified; approach distances and spotter arranged (contact network operator if needed) | Pass | Fail |
| Exclusion zone marked under the load path and slew area; no one under suspended loads | Pass | Fail |
| Public, traffic and neighbouring property protected (permits obtained if required) | Pass | Fail |
| Wind speed within crane and load limits; wind-sensitive loads (panels, sheets) assessed | Pass | Fail |
| Landing area prepared, clear and able to take the load; dunnage in place | Pass | Fail |
| COMMUNICATION | ||
| Signalling method agreed (radio channel / hand or whistle signals) | Pass | Fail |
| Radio check completed; dogger visible to operator or radio used for blind lifts | Pass | Fail |
| Lift briefing held with all involved; roles confirmed | Pass | Fail |
| Stop-work authority understood by all | Pass | Fail |
| APPROVAL | ||
| Lift approved to proceed | Yes | No |
| Notes / Conditions | ||
| Lift Planner Signature | ||
| Crane Operator Signature | ||
| Dogger / Rigger Signature | ||