Checklist · Building & Property
Roof Anchor Point Inspection Checklist
Inspection checklist for permanently installed roof anchor points, static lines and roof safety systems used for harness-based work at height. Covers anchor identification, compliance plates, fixings, corrosion, roof structure and documentation.
33 checklist items
Checklist Items
| Item | Pass / Yes | Fail / No |
|---|---|---|
| INSPECTION DETAILS | ||
| Date of Inspection | ||
| Building Name / Address | ||
| Roof Area / Anchor Layout Plan Reference | ||
| Anchor or System ID(s) Inspected | ||
| System Type (single-point anchors / static line / rail / ladder bracket) | ||
| Inspector Name and Height Safety Competency | ||
| DOCUMENTATION | ||
| Roof anchor layout plan displayed at roof access point | Pass | Fail |
| Installation certificate and manufacturer's instructions available | Pass | Fail |
| Date of Last Periodic Inspection | ||
| Inspection interval follows AS/NZS 1891.4 and the manufacturer's instructions; current inspection not overdue | Pass | Fail |
| IDENTIFICATION & TAGS | ||
| Each anchor has a compliance tag / plate showing rating, installer and next inspection date | Pass | Fail |
| Tags legible and current | Pass | Fail |
| Anchor numbers match the layout plan | Pass | Fail |
| ANCHOR CONDITION | ||
| Anchor eye / ring not bent, cracked, deformed or showing signs of a fall arrest load | Pass | Fail |
| Energy absorber indicator not deployed (where fitted) | Pass | Fail |
| No corrosion, pitting or rust staining on anchor, bolts or base plate | Pass | Fail |
| All fixings present, tight and of the type specified by the manufacturer | Pass | Fail |
| Anchor does not move, rotate or lift when tested by hand | Pass | Fail |
| Penetration through roof sheeting sealed; no water leaks around the anchor | Pass | Fail |
| STATIC LINES & RAILS (IF FITTED) | ||
| Cable or rail: no fraying, kinks, broken wires or corrosion | Pass | Fail |
| Line tension within manufacturer's range | Pass | Fail |
| Intermediate brackets, end anchors and tensioner secure | Pass | Fail |
| Travelling devices / shuttles run freely and are the system-compatible type | Pass | Fail |
| ROOF STRUCTURE & ACCESS | ||
| Roof sheeting and purlins around the anchor sound (no rust-through or loose fixings) | Pass | Fail |
| Fragile roof areas and skylights near anchors marked or protected | Pass | Fail |
| Anchor positions allow work without pendulum or swing-fall risk to the roof edge | Pass | Fail |
| Safe access to the roof (fixed ladder, hatch or walkway) in good condition | Pass | Fail |
| RESULT & SIGN-OFF | ||
| Defects found and action taken | ||
| Defective anchors tagged "Do Not Use" and removed from the layout plan until repaired | Yes | No |
| System compliant and fit for use | Yes | No |
| Next Inspection Due | ||
| Inspector Signature | ||
| Building Owner / Manager Signature | ||