Important: This SWMS template is provided as a starting point only. It must be reviewed and customised to reflect the specific conditions, hazards, and controls for your workplace and task. The PCBU remains responsible for ensuring the SWMS is suitable for the specific work. This template does not constitute legal advice. Refer to your state or territory WHS regulator for compliance requirements.
Working at Heights

Roof Safety Mesh Installation — Safe Work Method Statement

Safe Work Method Statement for installing roof safety mesh over purlins on new metal roofs and beneath existing roof sheeting, covering perimeter edge protection, rolling out and tensioning mesh, laps and fixing.

Download this template

Roof safety mesh is installed over the purlins before metal roof sheeting goes on, and beneath skylights and fragile sheeting on re-roofing jobs, so that a worker who falls through the roof is caught. Installing it is high-risk construction work (HRCW): until the mesh is down and fixed, the installers are walking on purlins with open space below them, often well over 2 metres above the floor. A SWMS is required before work starts.

Safety mesh must be manufactured and installed to AS/NZS 4389 (Roof safety mesh) and the manufacturer's instructions. That covers the wire gauge and spacing, how the mesh is tensioned, how side laps are joined and how ends are fixed to the purlins or the end of the roof. Mesh that is slack, not joined at the laps or not fixed at the ends will not catch a falling person. Remember that mesh only protects against falling through the roof. It does not protect against falls off the edge, so perimeter edge protection must be in place before the mesh crew goes up.

The hazards specific to this work are falling between purlins before the mesh is laid, tripping on the mesh roll or on mesh that is not yet tensioned, cuts from wire ends, the coiled mesh springing back during tensioning, wind lifting the mesh, and dropped rolls. On existing buildings, older roofs may contain asbestos cement sheeting and fragile skylights that must be identified before anyone goes onto the roof.

No high-risk work licence is required for mesh installation, but installers must be trained in the mesh system and in the fall protection method used. Plan the work so installers are protected by perimeter edge protection and, where there is a fall-through risk before the mesh is in place, by a fall arrest system with a rescue plan, or by working from an EWP or scaffold below.

Customise this template with the roof size, purlin spacing and height to the floor below, the mesh product and installation instructions, the perimeter edge protection system and handover tag, the fall protection used while laying mesh, the mesh delivery and lifting method, any asbestos or fragile roofing on the building, and the inspection sign-off before roofers start sheeting.

Personal Protective Equipment

Full-body harness with energy-absorbing lanyard or retractable (AS/NZS 1891)Hard hat with chin strapCut-resistant glovesSafety glassesLong-sleeved shirt to protect from wire endsNon-slip safety bootsHigh-visibility vest

High Risk Construction Work Types

  • •Risk of a person falling more than 2 metres

Risk Assessment

1.Pre-start checks and perimeter edge protection

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Fall from the roof edge while laying meshCatastrophicConfirm the perimeter edge protection is installed, complete and tagged before any mesh work starts. Mesh does not prevent edge falls. Check that the access point (stair tower or secured ladder with a protected landing) is in place.LowSupervisor
Hidden asbestos cement sheeting or fragile skylights on an existing roofCatastrophicOn existing buildings, check the asbestos register and roof survey before going on the roof. Treat all skylights and old sheeting as fragile and cover or barricade them. Do not cut, drill or break any material suspected to contain asbestos. Stop and follow the asbestos management plan.LowSupervisor

2.Lifting mesh rolls to the roof

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Mesh rolls dropped onto people below or overloading the purlinsHighLift rolls by crane, telehandler or hoist with rated slings, directed by a licensed dogman where slinging requires it. Barricade the area below. Land rolls over a frame or at the purlin positions approved by the builder, never as a point load mid-span. Never throw or roll mesh off the roof.LowSupervisor / Dogman
Back strain from handling heavy rollsModerateUse two-person handling for rolls, use mechanical lifting to roof level, and use a roll bar or dispenser for rolling out.LowInstallers

3.Rolling out mesh over the purlins

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Falling between purlins before the mesh is laidCatastrophicWork from the edge-protected end of the roof and roll mesh progressively so installers stand on purlins with laid and fixed mesh beside or below them wherever possible. Where an installer is exposed to an unprotected fall-through, they must be connected to a fall arrest system with a rated anchor or static line, with enough clearance and a rescue plan. Alternatively, work from an EWP or scaffold below. Never walk on unfixed mesh.ModerateInstallers / Supervisor
Tripping on the roll or loose meshHighKeep the roll in front of you and work facing it. Keep tools and offcuts off the roof walking line. Do not roll out more mesh than can be tensioned and fixed in the same run.ModerateInstallers
Wind lifting mesh or rollsModerateStop rolling out in strong or gusty wind. Fix each run before leaving it. Secure partially used rolls at the end of the shift.LowSupervisor

4.Tensioning, lapping and fixing

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Mesh not able to catch a falling person due to poor tension, laps or end fixingCatastrophicTension, lap and fix the mesh exactly as set out in the manufacturer's instructions and AS/NZS 4389, including side lap joining and end fixings to the purlins or end of the roof. The supervisor checks each run before sign-off.LowInstallers / Supervisor
Cuts or eye injuries from wire ends and spring-back when cutting or tensioningModerateWear cut-resistant gloves, safety glasses and long sleeves. Hold the mesh before cutting so the free end cannot spring. Turn in or cap cut wire ends. Keep your face clear of the mesh when tensioning.LowInstallers

5.Inspection and handover to roofers

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Roofers working over incomplete or damaged meshHighThe supervisor walks the full roof area and checks coverage, tension, laps, end fixing and any penetrations. Record the inspection and hand over in writing to the roofing contractor. Mark any area not yet meshed as a no-go zone with barricades. Inform the roofers that any mesh cut for penetrations must be trimmed and reinforced in line with the manufacturer's instructions.LowSupervisor

6.Pack-up

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Offcuts and tools left on the roof creating trip and drop hazardsModerateCollect offcuts and wire ends into a bin or bag as you go. Lower waste and tools by hoist or rope, not by throwing. Remove harness and lanyard only once back in a protected area.LowInstallers

Relevant Codes of Practice

Worker Acknowledgement

By signing below, I confirm that I have read, understood and agree to comply with this Safe Work Method Statement.

Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________