Important: This SWMS template is provided as a starting point only. It must be reviewed and customised to reflect the specific conditions, hazards, and controls for your workplace and task. The PCBU remains responsible for ensuring the SWMS is suitable for the specific work. This template does not constitute legal advice. Refer to your state or territory WHS regulator for compliance requirements.
Plumbing & Gas

Bathroom Renovation Plumbing — Safe Work Method Statement

Safe Work Method Statement for plumbing work during bathroom renovations, including isolating services, stripping out fixtures, relocating wastes and water lines, rough-in, and fit-off of showers, vanities, toilets and baths in occupied homes.

Download this template

Plumbing in a bathroom renovation looks low risk but has some serious hazards because of the age of the house and the work around it. If the home was built before 1990, wall sheeting, floor sheets, vinyl backing and some waste pipes may contain asbestos. Disturbing material that contains or is likely to contain asbestos is high risk construction work, which is why this template lists it as HRCW. If an asbestos register or test shows no asbestos, record that and the work may not need a SWMS by law, but builders and principal contractors normally still require one.

The specific hazards are asbestos in fibre cement sheet behind tiles and in old cisterns and flues; crystalline silica dust from chasing walls, cutting tiles and removing mortar beds; cutting into live cables behind walls; and handling heavy cast iron or steel baths, often in small rooms and up stairs. Hot work for brazing copper creates fire risk in wall cavities. Primers, solvent cements and waterproofing membranes give off fumes in a small, closed room. Work in occupied homes means water is off for the family, and the bathroom floor is often the only route between rooms.

The plumbing must be done by a licensed plumber holding the licence required in your state or territory and comply with AS/NZS 3500. Asbestos removal over 10 square metres of non-friable material needs a licensed removalist; smaller amounts can be removed by a competent person following the asbestos removal code of practice. Waterproofing may need its own licence in some states, so check your state or territory regulator.

Your SWMS must cover how asbestos is identified before strip-out, dust control for cutting and chasing, isolation of water and electrical services, manual handling of baths and fixtures, and hot work.

Customise this template with the house age and asbestos status, the scope of plumbing changes, the strip-out sequence and who does it, the electrician for isolations, dust control equipment, hot work permit details, and the licence numbers of the plumbers.

Personal Protective Equipment

Fit-tested P2 respirator (or higher) for cutting, chasing and strip-outSafety glasses or gogglesHearing protectionCut-resistant glovesSteel-capped safety bootsKnee padsDisposable coveralls (asbestos or heavy dust)

High Risk Construction Work Types

  • •Work that involves, or is likely to involve, disturbing asbestos

Risk Assessment

1.Pre-start inspection and asbestos check

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Disturbing asbestos in wall sheets, floor sheets or vinylCatastrophicFor homes built before 1990, treat fibre cement sheeting, vinyl floor backing and old flue or cistern materials as asbestos until tested. Arrange sampling before strip-out. Where asbestos is confirmed, remove it before plumbing work starts, by a licensed removalist where required. Record the result in the SWMS.LowBuilder / Licensed Plumber
Occupants exposed to dust and work hazardsModerateSeal the bathroom door and any openings with plastic sheeting. Agree a clear route for occupants and keep children and pets out. Arrange temporary toilet access if the only toilet is affected.LowLicensed Plumber / Builder

2.Isolate water, gas and electrical services

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Flooding or scalding from live water lines during strip-outModerateTurn off the water at the meter or the bathroom isolation valves and turn off the hot water unit before draining lines. Cap all open pipes at the end of each day.LowLicensed Plumber
Cutting into live cables in walls during strip-out or chasingHighHave a licensed electrician isolate bathroom circuits, including heated towel rails, exhaust fans and lights, before demolition. Scan walls with a cable detector before chasing or cutting. Use tools with RCD protection.LowLicensed Electrician / Licensed Plumber

3.Strip-out of fixtures, tiles and baths

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Back injury removing cast iron or steel bathsHighPlan the removal path before starting. Use at least two people and a trolley or stair climber for cast iron baths, or break them in place under a heavy cover while wearing eye and hearing protection. Do not carry baths down stairs single-handed.ModerateLicensed Plumber / Builder
Cuts from broken tiles, glass shower screens and porcelainModerateWear cut-resistant gloves and safety glasses. Tape glass panels before removal. Bag broken porcelain and tiles in heavy bags or bins.LowAll Workers

4.Chasing, cutting and rough-in

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Silica dust from chasing walls and cutting tiles or mortar bedsHighUse wall chasers and saws with water suppression or an on-tool extraction shroud connected to an H-class vacuum. Wear a fit-tested P2 respirator. Clean up with an H-class vacuum or wet methods, never by dry sweeping.ModerateLicensed Plumber
Fire in wall cavities from brazing copperHighUse press-fit or crimp fittings where possible. Where brazing is needed, use a heat shield behind the joint, keep a fire extinguisher and water spray at hand, wet surrounding timbers and check the cavity for smouldering for at least 30 minutes after hot work.LowLicensed Plumber

5.Waterproofing and solvent use

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Inhaling solvent cement, primer and membrane fumes in a closed roomModerateRead the safety data sheet for each product. Ventilate with the window open and a fan exhausting outside. Keep containers closed. Wear the gloves and respirator the SDS specifies.LowLicensed Plumber / Waterproofer
Skin contact with membranes and adhesivesLowWear nitrile gloves and long sleeves. Wash skin promptly after contact.LowAll Workers

6.Fit-off, testing and clean-up

Hazard / RiskInitial RiskControl MeasuresResidual RiskResponsibility
Leaks causing water damage or slip hazards after handoverModeratePressure test water lines before close-in and check wastes for leaks under flow at fit-off. Set the tempering valve to the required outlet temperature and record it.LowLicensed Plumber
Dust left in the homeModerateVacuum the work area and route with an H-class vacuum before removing sheeting. Dispose of asbestos waste to an approved facility in sealed, labelled bags.LowLicensed Plumber / Builder

Relevant Codes of Practice

Worker Acknowledgement

By signing below, I confirm that I have read, understood and agree to comply with this Safe Work Method Statement.

Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________
Name: ___________________Date: ___________________
Signature: ___________________________

Download this template

Go paperless with WorkSignals

Manage SWMS digitally — track sign-offs, attach photos, and access everything from your phone.

Try WorkSignals free