Demolition SWMS Templates

SWMS for demolition work including manual strip-outs, mechanical demolition and structural demolition that affects the physical integrity of a structure.

Demolition work is classified as HRCW under WHS Regulations Schedule 3 where the work involves the demolition of a structure that is load-bearing or otherwise related to the physical integrity of a structure — which in practice captures almost all demolition beyond minor fit-out strip-out. Structural demolition using mechanical plant, implosion or deliberate collapse also triggers separate HRCW classifications.

Work covered by this category includes manual strip-out of internal fit-outs, mechanical demolition using excavators with demolition attachments, selective demolition of walls and slabs, façade retention work, bridge and civil demolition, and post-demolition ground remediation.

All states and territories require a demolition licence for demolition of structures of specified heights or complexity. In most jurisdictions this is required for structures over 3–4 metres. Supervisors on demolition sites must hold the appropriate licence category and have current asbestos awareness training, as the presumption of asbestos in any pre-2003 building material applies until proven otherwise by a NATA-accredited sampling and testing process.

The SWMS must address structural instability risks, plant exclusion zones, overhead hazard management, dust and noise controls, and the management of any hazardous materials identified during the pre-demolition hazardous materials survey. A pre-demolition engineering assessment is required for any work that may affect structural integrity.

Manual Demolition

Safe Work Method Statement for manual demolition of internal and external building elements including walls, ceilings, partitions and roofing. Applies where structural integrity of adjacent elements may be affected.

4 tasks10 risks identified7 PPE items

Mechanical Demolition

Safe Work Method Statement for mechanical demolition operations using excavators, demolition attachments, and heavy plant to demolish structures including commercial and industrial buildings.

5 tasks9 risks identified7 PPE items

Structural Demolition

Safe Work Method Statement for the demolition of structural elements including load-bearing walls, columns, beams, and slabs using manual and mechanical methods on construction projects.

5 tasks8 risks identified7 PPE items

Shopfitting Removal

Safe Work Method Statement for the removal of shopfitting and fit-out elements including partitions, ceilings, joinery, floor finishes, and fixtures in occupied or partially occupied commercial premises.

5 tasks8 risks identified6 PPE items

Internal Strip-Out

Safe Work Method Statement for complete internal strip-out of commercial and residential buildings, including removal of all fit-out elements, services, and finishes in preparation for new construction works.

5 tasks7 risks identified7 PPE items

Concrete Saw Cutting — Demolition

Safe Work Method Statement for concrete cutting and saw cutting operations during demolition works, including floor saw cutting, wall saw cutting, and core drilling activities on construction sites.

5 tasks8 risks identified7 PPE items