Site Safety & Administration

Emergency Evacuation Drill Record

Record of an emergency evacuation drill for a workplace or construction site, capturing the scenario, alarm, evacuation time, headcount, warden performance and issues to fix. Supports testing of the emergency plan required by the WHS Regulations.

32 checklist items

Download this template

Checklist Items

ItemPass / YesFail / No
DRILL DETAILS
Date of Drill___________________________
Site / Building___________________________
Time Alarm Raised___________________________
Drill Type (announced / unannounced)___________________________
Scenario (e.g. fire, gas leak, structural collapse)___________________________
Drill Coordinator / Chief Warden___________________________
ALARM & COMMUNICATION
Alarm / siren heard in all areas (including noisy and remote areas)Pass ☐Fail ☐
Workers recognised the alarm and began evacuating promptlyPass ☐Fail ☐
Two-way radios / PA used effectively by wardensPass ☐Fail ☐
EVACUATION
Workers used the nearest safe exit routePass ☐Fail ☐
Exits and routes clear of obstructionsPass ☐Fail ☐
Plant shut down and left safePass ☐Fail ☐
Workers did not stop to collect belongingsPass ☐Fail ☐
Visitors and contractors escorted to assembly areaPass ☐Fail ☐
Persons needing assistance evacuated per their planPass ☐Fail ☐
ASSEMBLY & HEADCOUNT
Assembly area signed and in a safe locationPass ☐Fail ☐
Sign-in register / roll used for headcountPass ☐Fail ☐
Number of people on site___________________________
Number accounted for at assembly area___________________________
Time all persons accounted for___________________________
Total evacuation time (minutes)___________________________
WARDENS
Area wardens checked their areas and reported to chief wardenPass ☐Fail ☐
Wardens identifiable (helmets / vests)Pass ☐Fail ☐
Emergency services liaison point identifiedYes ☐No ☐
OBSERVATIONS
What worked well___________________________
Issues identified___________________________
ACTIONS
Corrective actions (including updates to the emergency plan)___________________________
Person responsible___________________________
Action Due Date___________________________
Next Drill Due___________________________
SIGN-OFF
Chief Warden / Coordinator Signature___________________________
Site Manager Signature___________________________

Download this template

Run checklists digitally with WorkSignals

Complete this checklist on your phone, capture photos of defects, and generate instant reports — no paper required.

Try WorkSignals free